nestonexStart a project
SELECTED WORK

The work.
Across the stack.

Trading platforms, multi-chain wallets, AI systems, marketplaces and artist platforms. Each project opens into the challenge, the approach, and what we delivered.

20 case studies covering trading and market systems, multi-chain wallet and settlement backends, AI and language-model engineering, marketplaces and platforms, and artist and immersive work. Each one is written around the question it answers, with the architecture decisions stated rather than summarised.

What these systems have in common

Most of them are the kind of software where being almost right is expensive. An arbitrage engine acting on an order book with a missing update is not slightly wrong, it is placing a real trade against a price that no longer exists. A wallet processing two of the same user's swaps at once is not slightly wrong either. A payout system that releases funds before an eligibility check is a compliance problem rather than a bug report.

So the engineering that shows up repeatedly is unglamorous: sequence-gap detection, decimal-only money math, idempotent handlers, per-user sequencing, transactional outboxes, and an approval standing between an automated system and a hot wallet. The interesting part of an on-chain product is rarely the chain; the interesting part of an AI product is rarely the prompt.

The second thing they share is a boundary drawn deliberately around what a model may do. Wen's in-app agent calls typed, validated tools that pass the same checks as a tap in the interface. Axon Wallet lets a model propose an intent and nothing else, with schema validation, policy limits and two-factor standing between the proposal and the transaction. ProTrader's coach is given a member's own computed numbers and guardrails that refuse trade recommendations outright. Separating proposing from deciding is what makes an agent shippable.

Where a project, testimonial or example here is illustrative rather than delivered client work, the page carrying it says so. There are no traffic figures, revenue claims or client performance metrics on this site.

If you need this, start here

The case studies say what we built. These say which service your problem probably is:

Not sure? Describe what happens today and what you want to be different. Sorting it into a service is our job. The glossary defines the vocabulary these pages use, and the planning guides work through the decisions that come before a build.

01 /

Trading & markets

02 /

Platforms & marketplaces

03 /

Wallets & Web3

04 /

AI systems

05 /

Culture & experiences